|
10,416 Sq. Ft. Building and 7 Acres in Austin, Indiana
Zoning: Industrial
Location:
3636 Frontage Road
Covenants:
Industrial Zoning
Industrial Park: Yes
Within City Limits: Yes
Population: 4,400
Floodplain: No
Enterprise Zone: No
Foreign Trade Zone: No
Wetlands: No |
Proximity
Mode/Distance:
Highway: > .2 Mile
Air Freight: 35 Miles
Barge: 25 Miles
Rail
Service Available: No
|
Electrical
Service Available: Yes
Provider: Duke Energy
Gas
Service Available: Yes
Provider: Midwest Natural Gas
Line Size: 4 in. Low Pressure
Telephone
Service Available: Yes
Provider: Verizon
Water
Service Available: Yes
Provider: Stucker Fork
Line Size: 8 in.
Sewer
Service Available: Yes
Provider: Austin Municipal
Line Size: 8 in.
Communitcations
(Wireless Internet)
Service Available: Yes
Provider: Citizens Communication Corp. through the City of Scottsburg
Fire Protection
Service Available: Yes
Provider: Jennings Twp. VFD*
|
|
Sale
Site for Sale: Yes
Terms: Negotiable
Lease
Site for Lease: Yes
Taxes
District: Town of Austin
Abatement Possible: Yes on Capital Equipment and New Building Construction
|
Owner
Hunley Sales & Service
3636 Frontage Road
Austin, IN 47102
Agent
Everitt Hunley
(812) 794-4714
Economic Development
Scott County Economic
Development Corporation
Post Office Box 156
90 North Main Street, Suite C
Scottsburg, IN 47170
Phone: (812)752-7268
Fax: (812)752-7272
Email:
|
This building is located on the Frontage Road adjacent to Interstate 65.
|
|
Total Size: 3 acres
Available: 7 acres total
Subdividable?: Yes
Building Size: 10,416 sq ft
Office Space: 2,600 sq ft
Overhead Doors: 5 with 17’ height Ceiling Height: 20 ft Overhead Crane: Number of Cranes: 4 (2 Ton)
|
Proximity to Residential: 0
|
|
DISTANCE TO HIGHWAY:
>.2 Mile to I-65
DISTANCE TO AIRPORT:
Standiford Field – Louisville, KY
Driving time – 45 minutes
Clark County Regional Airport
Driving time – 25 minutes
DISTANCE TO PORT:
Clark Maritime Centre
Jeffersonville, IN
Driving time – 30 minutes
GAS SERVICE:
Midwest Natural Gas Co.
Larry Trett
812-752-2230 |
GAS LINE SIZE:
Daily interrupted amount available for new user is 7200 cubic feet per day
WATER SERVICE:
Stucker Fork Water
Contact
Larry Trett
812-752-2230
WATER MAIN SIZE:
Water pressure max – 80 PSI
Residual – 62 PSI
Capacity of Supply – 1600 GPM
SEWER SERVICE:
Austin Municipal
Contact Austin Town Hall
812-794-2877 |
ELECTRICAL SERVICE:
Duke Energy
Primary – 7200/12,470v
Standard Secondary – 120-208 V 277-480 V
Utility Load Limitations – 300+KW
FIRE PROTECTION:
ISO RATING- 10
RAIL CARRIER:
Louisville & Indiana Railroad
ELECTRICAL PROVIDER:
Duke Energy Contact: Chip Orben 812-375-2044 |